‹ Back to apps
Critical Path Partners forensic scheduling MCP
Thirteen tools for Primavera P6 forensic delay analysis: AACE windows (29R-03 MIP 3.3), DCMA-14 health checks, Monte Carlo schedule risk with AACE 122R-22 QRAMM maturity, TIA fragnet (MIP 3.7), collapsed as-built (MIP 3.8), and a claim workbench evidence ledger. Remote server, Streamable HTTP, no API key. Open-source CPM engine (MIT) at github.com/danafitkowski/cpp-cpm-engine.
What’s inside
1 MCP server- MCP servercriticalpathpartnersHosted forensic scheduling tools for Primavera P6 XER files (Streamable HTTP, no API key)